K + S Minerals and Agriculture Werra

AGO GmbH Energie + Anlagen has planned and built a hot steam plant for the customer K + S Minerals and Agriculture GmbH in Werra. The plant consists of two large-scale two-burning tube boilers with a steam power of 50 t/h each and a pressure forming station at 1 bar/l and at 3 bar/l.

Technical data:

  • Steam power: 10 to 100 t/h
  • Design parameters: 250 °C at 13.0 bar/hour
  • Pressure forming station: 1 bar/hour, 10 to 70 t/h
  • Nominal width: DU 1 bar/ü, DN300 / DN1000
  • Pressure forming station: 3 bar/o, 10 to 70 t/h
  • Nominal width: DU 3 bar/ü, DN300 / DN600