h1. Projects
References & Partners

01.01.1970
01:00:00
Projects
Refrigeration plant consisting of three refrigerating machines and recoolers to supply the Daimler AG production facility in Rastatt. AGO worked as a joint venture with Ed. Züblin Karlsruhe as general contractor for the refrigeration plant, building services and building services.

01.01.1970
01:00:00
Projects
Expansion of the geothermal heating plant Erding I. Installation of a compression heat pump to generate heat for the Erding district heating network by using the thermal water.

01.01.1970
01:00:00
Projects
Cogeneration plant consisting of a CHP and an absorption chiller ago congelo® to supply the lower level of the Krombacher brewery with electricity, heat and cooling.


01.01.1970
01:00:00
Projects
Construction of an energy centre to supply the new brewery in Munich, Langwied. Installation of a multi-boiler plant for the heat supply of the production. Own power generation via 2 CHP modules and use of the waste heat for the heating network.

01.01.1970
01:00:00
Projects
In the existing Emuge refrigeration plant, an additional refrigeration machine (speed-controlled screw compressor) was integrated into the 6/12°C refrigeration system for redundancy reasons. The cooling water system was extended by an open cooling tower.



01.01.1970
01:00:00
Projects
High pressure steam generation by means of exhaust gases from a glass melting tank, with feedwater degasification and water treatment. Hot water generation on natural gas-fired shell boilers. Heat recovery in a district heating network with pressure maintenance and District Heating Pumps.



01.01.1970
01:00:00
Projects
Combined heat, power and cooling system consisting of a CHP and an absorption chiller ago congelo® to supply the company with electricity, heat and cooling.


01.01.1970
01:00:00
Projects
Installation of a new CHP plant on the premises of Brothaus GmbH in Burgbernheim. Consisting of a CHP unit for the production of hot water with connection to the existing heating network and supply of a newly installed absorption chiller Congelo. Installation of a new control system including new software for the existing refrigeration plant.

01.01.1970
01:00:00
Projects
Construction of a technical centre including periphery as well as an EMSR system for the power and heat supply of residential areas in Kolbermoor.

01.01.1970
01:00:00
Projects
Renewal of the "WKZ-Süd" energy centre for feeding into the supply network of the University of Bayreuth. With this energy centre, the emergency power and emergency heat supply is also supply to the Botanical Gardens of the University of Bayreuth is ensured.

17.09.2020
15:49:28
Projects
An energy centre for the district administration and a hotel complex were newly built on the Karl Kurz site. The contract included the installation of a hot water boiler with a CHP connection, integration of the buffer tanks and the district heating pump station. For the cooling supply a split refrigeration machine with reserve space, the integration of the cold water buffer storage and the district cooling pump station were installed.

01.01.1970
01:00:00
Projects
The scope of supply included an air conditioning system with fresh air supply and heat recovery system for the new office complex in Kronach.

23.09.2020
12:03:13
Projects
Stadtwerke Erlangen built a heating and cooling center for the power supply of the new Siemens Campus in Erlangen. AGO AG realized the complete plant technology for the refrigeration center including generation, cold storage, free cooling as well as softening plants for adiabatic cooling. The heating system consists of 4 CHP modules with an electrical output of 2,096 kW each. For this purpose, AGO AG carried out the entire plant construction including replacement pressure maintenance for the district heating network.

08.12.2020
09:14:58
Projects
For the Oettinger brewery, one ago congelo® absorption chiller each was installed at the Mönchengladbach and Oettingen sites to cool a refrigerant circuit. In both projects, the heating water of a combined heat and power plant is available as waste heat.


23.09.2020
13:19:07
Projects
The scope of supply included installation and commissioning of 2 steam boilers each generating 7,5 to/h steam at 10,0 bar. The system included an exhaust heat exchanger for return flow pre-heating of the district heating network, instrumentation and control technology and steel platform. The new boiler plant was embedded hydraulically into the existing system.


01.01.1970
01:00:00
Projects
Delivery of a cogeneration unit with a downstream exhaust gas boiler and heat exchanger including gas cooling to 80°C, a feed water pump system and 72h BOB control. Internal engine cooling circuit, including insulation, lubrication oil supply system, sound insulation, muffler and switchgear, auxiliary drive cabinet and generator power field.

01.01.1970
01:00:00
Projects
Supply of clean room production areas , as well as the office building by means of high efficiency air handling units and fans.

26.11.2020
13:43:13
Projects
Extension of the heating plant by two cogeneration units. Hydraulic connection to the existing district heating network . Detail engineering, supply mechanical and electrical engineering , construction, commissioning , trial operation and documentation.


07.12.2020
10:32:17
Projects
The existing gas turbine plant has been replaced with a CHP unit. Based on the increased overall efficiency in reference to the gas turbine system, the CHP plant has been elected “CHP of the month of August 2014” by the Federation of German Industries for Cogeneration.

07.12.2020
11:02:11
Projects
In the course of modernization measures, the four existing cogeneration units were dismantled and replaced by new ones with reconstruction of terminal groups, gas control systems, catalysts.


07.12.2020
11:42:15
Projects
Redundant cooling by means of two oil-free turbo chiller units and two hybrid coolers allocated to the chillers. In addition two free redundant cooling heat exchangers have been installed. An integrated brine-water-heat pump is providing heat for the rooms and ventilation.


01.01.1970
01:00:00
Projects
The scope of supply included installation and commissioning of 2 steam boilers with exhaust heat exchangers each generating 18 to/h steam at 16,0 bar to supply the production facility in Biessenhofen.

01.01.1970
01:00:00
Projects
Installation of a new heating plant consisting of superheated steam generators, degasification of feed water, condensate system, water treatment and automatic control device. The plant has a redundant design to ensure the security of supply.

01.01.1970
01:00:00
Projects
Hotel building over 14 floors with guest rooms, a conference floor and a technical floor. Installation of ventilation, heating, refrigeration and sanitary facilities including heat recoveries and fire protection equipment.

01.01.1970
01:00:00
Projects
In order to increase the security of supply of the district heating system, the heating plant was extended by installing of two identical, natural gas-fired hot water boilers with a total thermal output of about 16.8 MW inside a new building. Also included in the scope of supply were the necessary connections to the existing systems of the heat plant such as heating water flow/return flow, gas supply and drinking water.

01.01.1970
01:00:00
Projects
Barely twelve months passed between the order confirmation to AGO AG until the implementation of the new Energy Center II in Dresden. This is a record-breaking time considering that all tender procedures and construction designs for the project in the value of 22 million€ as well as all installation work was carried out. Hot water heating facility with thermal power station and heat exchangers operated by natural gas and heated with 10 bar saturated steam from gas engines and steam boilers.

01.01.1970
01:00:00
Projects
Supply and exhaust air system for the Institute of Pathology at the Klinikum Kulmbach including special exhaust air aggregates with PPS piping. Fire protection and I&C-Equipment. Specific requirements due to laboratory standards.

07.12.2020
14:44:18
Projects
The order covers the implementation planning, installation, startup incl. test run for the CHP plant in Wunsiedel. The main components of this plant are: combustion chamber, thermal oil boiler, ORC turbine, wood chip dryer, electro technology and process control system.

26.11.2020
11:51:13
Projects
The new combined heat and power plant supplies the city consisting of 100,000 residents with power and hot water. A Greek company designed the building and the boiler plant, currently with 75 MW (final stage approximately 115 MW). AGO installed the complete gas engine plant with Deutz engines, including the entire electrical engineering, medium voltage system, and SCADA system.

01.01.1970
01:00:00
Projects
Absorption chiller ago congelo® to supplement the cold supply of a central warehouse for the food retail trade.
