Extension of the capacity of the district heating network by new construction of a boiler house. Complete plant construction for a final expansion with 35 MW FWL.

The new building was also commissioned to maintain the pressure of the district heating system (redundance to existing pressure maintenance), ventilation, gas supply, fuel oil supply including tank system, water treatment, building heating and sanitary technology.

Technical data:

  • 2 bivalent hot water boilers for gas / heating oil firing with 8.7 MW FWL each
  • Design TS: 120 °C PS: 16 bar (DGRL Kat.II)
  • Total air intake: 42,400 m3/h
  • Total exhaust air: 19.700 m3/h