St. Gobain, Neuburg an der Donau
As general contractor, the AGO planned and built a BHKW plant for two gas engines. The scope of services includes buildings including Exterior systems, BHKW module with two exhaust gas heat exchangers for hot water and heating water, recooling, natural gas, lubricating oil, ventilation, exhaust gas, medium voltage, electric and MSR technology. The new plant was hydraulically integrated into the existing plant via a pipe bridge.
Technical data:
- Power electric: 1.999 kW
- Thermal performance: 2,200 kW