Citizens Crailsheim
Media supply of a new production hall with compressed air, drinking water, steam, condensate, installation of a BHKW with steam generator as exhaust gas heat exchanger. The engine waste heat is used for drinking water heating and building heating. A 80 m3 buffer memory was installed for load fluctuations.
Technical data:
- Power electric: 1.99 MW
- Thermal performance: 1.07 MW
- Steam generators: 2 × 1,500 kg/h, 10 bar