back to overview
Heat Power

Stadtwerke Tübingen BHKW Eisenhut I

AGO GmbH was commissioned to modernise the BHKW plant Eisenhut II. In addition to the replacement of the plant, the scope of services included the construction of the building, the renewal of the control system and the integration of an SCR catalytic converter system with a cellar-welded urea tank. In addition, efficient exhaust gas heat recovery and residual heat utilization was realized by the use of heat pumps. The district heating power pump system has also been completely renewed. The project put the highest demands on the reduction of sound emissions and vibration decoupling and was successfully implemented.

Technical data:

  • Electrical power BHKW : 2 × 2.004 kWel
  • Thermal performance BHKW: 2 × 2.162 kWth
  • Heat pump power: 2 × 250 kW
  • Net volume flow: 216 m3/h
  • Urea tank: 30 m3

Related projects

Stadtwerke Stein
Heat Power
Stadtwerke Pirna
Heat Power