Stadtwerke Straußberg
In an existing building a modern BHKW plant was planned and realized. AGO GmbH took over the installation of three gas engine block heating power plants, including sound cabins with ventilation system, an exhaust system with SCR catalytic converters, as well as complete piping and connection to existing plant technology. In addition, a medium-voltage switchgear was integrated in a specially built station building, with direct feed into the 10-kV network and a tailor-made plant control system.
Technical data:
- Electric. Power: 3 × 2.535 kW
- Heat output: 3 × 3.079 kW