Paulaner Brewery Langwied
Establishment of an energy center for supplying the new brewery facility in Munich, Langwied.
Installation of a multi-cocket system for heat supply of production. Own power generation via 2 BHKW modules and use of waste heat for the heating network.
Technical data:
- High pressure hot water: 32 MW, 160 °C, 16 bar
- Hot water: 16 MW, 105 °C, 10 bar
- Central heating: 3 MW, 35 °C, 10 bar



