Milk factories Oberfranken
Establishment of a new technology centre for the Oberfranken dairy plants at the Meeder site for the energy supply of production lines with electricity, steam and heat.
Technical data:
CHP plant (110 °C, 6 bar ü)
- Thermal performance: 1.291 kW
- Electrical power: 1.999 kW el.
Heat steam boiler
- Steam performance (satellite steam): 1.010 kg/h
- Medium steam pressure: 10 bar