For ventilation and ventilation, a ventilation system was retrofitted in the building 37 for the production rooms in order to improve the spatial air quality.
Furthermore, a refrigeration machine was retrofitted on the existing refrigeration system and integrated into the existing system system system. The heating and cooling system for the new ventilation system was also installed.
Technical data:
- Air quantity RLT devices: 20,000 m3/h
- Heater Power: 155 kW
- Cooling capacity: 142 kW
- WRG power: 99 kW
- Refrigerant power: 364 kW