EnBW - Wesergold, Dodow
At the Dodow site of the Wesergold Group, the modernization of steam, heat and cold plants based on an entirely optimized energy concept was implemented as part of a contracting project by EnBW Contracting GmbH. The newly built energy center comprises two steam boilers and a BHKW, as well as a new cold center with ammonia refrigeration systems. The aim of reducing energy costs through a state-of-the-art, efficient and safe energy supply has been achieved.
Technical data:
- CHP electricity. Power: 800 kW
- Steam capacity: 6.0 t/h saturated steam with 4-train boiler/Eco, 6.0 t/h saturated steam with 3-train boiler/Eco
- Heating water: 400 kWth with storage 37 m3
- NT heat extraction for water preheating
- Water treatment: 2 × 4 m3/h