On the grounds of the Dillinger Hütte in Saarlouis, STEAG New Energies built a new heating plant to cover peak load requirements of the FVS district heating system. AGO GmbH installed two hot water boilers with a rated heat output of 20.4 MW each with the associated boiler control and plant engineering.

Technical data:

  • Fire performance: 42.230 kW
  • Rated heat output: 40.828 kW (Kessel incl. ECO)
  • System temperatures: VL 135 °C / RL 75 °C
  • Heat exchanger: 44,000 kW (4 pieces per 11 MW)
  • district heating system: VL 129 °C / RL 70 °C