For ventilation and ventilation of the social building, two combined supply and exhaust air systems as well as a special exhaust air system with filtering for welding gas extraction were installed.

Furthermore, the air conditioning of the building is realized by a refrigeration machine installed in the exterior. This supplies the air-conditioning systems and the circulating air cooling cassettes installed in the 1st floor.

Technical data:

  • Air quantity RLT devices: 62.000 m3/h
  • Special exhaust systems: 6,000 m3/h
  • Refrigeration engine: 206 kW
  • Refrigeration: 18 kW
  • Heater Power: 198 kW
  • Cooling capacity RLT: 167 kW
  • WRG power: 136 kW