Construction of an energy centre to supply the new brewery in Munich, Langwied. Installation of a multi-boiler plant for the heat supply of the production.
Own power generation via 2 CHP modules and use of the waste heat for the heating network.
h5. Technical data:
* High pressure hot water: 32 MW, 160°C, 16 bar
* Hot water: 16 MW, 105°C, 10 bar
* Central heating: 3 MW, 35 °C, 10 bar
* Electrical power: 2 x 999 kW
