In order to increase the security of supply of the district heating system, the heating plant was extended by installing of two identical, natural gas-fired hot water boilers with a total thermal output of about 16.8 MW inside a new building. Also included in the scope of supply were the necessary connections to the existing systems of the heat plant such as heating water flow/return flow, gas supply and drinking water. h5. Technical data: * Total combustion capacity (gas): 2 x 8.782 kW * Nominal capacity hot water boiler: 2 x 8.000 kW * Capacity heat exchanger: 2x 386,78 kW * Medium hot water: T[~max~]: 140°C, P[~max~]: 16,0 barü