The order covers the implementation planning, installation, startup incl. test run for the CHP plant in Wunsiedel. The main components of this plant are: combustion chamber, thermal oil boiler, ORC turbine, wood chip dryer, electro technology and process control system. h5. Technical data: * Heating capacity: 4.580 kW * Thermal oil boiler: 3.995 kW * ORC turbine: 758 KW * Heat absorption wood chip dryer: max. 4.400 kW * Implementation planning: AGO